Loop Danışmanlık Grubu | PS-1 Pump Station Project, Garyan, LIBYA
17585
portfolio_page-template-default,single,single-portfolio_page,postid-17585,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-theme-ver-11.0,qode-theme-bridge,wpb-js-composer js-comp-ver-5.1.1,vc_responsive
 

PS-1 Pump Station Project, Garyan, LIBYA

About This Project

“PS-1 Pump Station” project, which has been carried out under “Tarhunah-Abu Zayyan Water Lines” project, is an industrial project in which METIS is the main contractor. The project has been carried out within the scope of the “Great Man Made River” project, which is considered to be the world’s largest single project undertaken and cost about $ 70 billion. Experts of Loop Consulting Group have undertaken and provided the required support on the following issues at all stages of the construction management within the scope of the “PS-1 Pump Station” project;
Determination and Assessment of the Risks, Bill of Quantities, Time and Cost Estimates, Preparing Baseline Work Schedules (Level-4), Human Resource and Machine-Equipment Resource Planning, Preparing Project Budget and Cash Flow, Preparing Mobilization and Demobilization Plans, Determination of Progress Measuring System, Preparing Progress Payments, Critical Path Method Analysis, Updating Work Schedule, Updating Budget and Cash Flow, Monitoring Work Schedule Performance, Monitoring Cost Performance, Earned Value Analysis, Claims and Change Management.
Primavera Project Planner P3” software was used actively and effectively in the planning and monitoring stages of the “PS-1 Pump Station” project.
Client:

METIS

Location:

Garyan, LİBYA

Scope of the Work:

Time Management, Cost Management, Risk Management, Contract Management, Claims Management, and Change Management

Date:

2004-2006